We take and order, painting of facing building, apartments, individual houses, repair of ground work, sealing and various constructions.
SOGO KENSO,CO.LTD
Add.5-7-9 Minami nagasaki, Toshima-ku, Tokyo 171-0052
Tel:03-3953-0880 Fax:03-3953-0883
License of constructor by Tokyo governor: No.128846
日本語  English

Home | An outline of company | Various all sorts of construction | List of price
An example of past constructions | A check up your home | Inquiries

  
A result of check up your house
 
More than 70 marks From 50 to 70 maerks Under 50 marks
Degradation and damage are considerably proceedings. It needs immediate repaint and repair. Degradation is seen. We advise you to make a plan to repaint it within 1 to 2 years. There's no big degradation but we advise you to make this diagnosis again after 2 or 3 years.
 
☆An inspection order is free of charge.☆
 
An inspection and inquiry are from here.

 ●Degradation of your house start when you building. Even though it looks not so bad, damage is proceeding in an unexpected place.
 ●A house which is exposed to severe nature such as wind and rain,ultraviolet rays and exhaust gas and with stands it. You may protect it from degradation.
 ●The most important thing is protection that taking measures for degradation or corrosion.
 ●The new building after 5 to 6 year need check point.
  
A standard of the time of repainting 
(The time of repair depends on place and material.)
The life each place of a house is defferent by paint or material of groundwork not to mention various conditions such as house of sunlight, ventilation, structure and surrounding environment. I showed the time of repainting which is a general standard on the time. Please consult with TOkyo painting and industry cooperative society about more details information.
 
A case of an individual house A case of an apartment etc.
A oart and a meterial a time of painting (life)
Outer wall ricin Five years
Outer wall spraying tile Six years
Outer wall elastic spraying tile Eight years
Roof color tin Ten years
A western shaped tile Ten years
Metal parts
(a handrail,gate,etc.)
Five years
wooden part(a pillar, a decorative gable, window frame, etc.) Five years
A oart and a meterial a time of painting (life)
Outer wall ricin Five years
Outer wall spraying tile Six years
Outer wall elastic spraying tile Eight years
A common passage, a ceiling, and an inside wall Eight years
Roof waterproofing Ten years
Metal parts (a handrail, an iron door, etc.) Five years
Cloth finish concrete Ten years